VISION ENERGIZES JÚLIO DE CASTILHOS SUBSTATION – CEEE-GT

VISION energized in April 2021 the expansion of the 138 kV substation supplied on a turnkey basis.
The scope of supply included two modules, a transmission line module and a bus transfer module, in addition to adaptations of the remote terminals at the SANTA MARIA 1 and UHE JACUI substations.
The contract consisted of the supply of projects, yard equipment, protection and control panels, electromechanical assembly and civil construction.
The JULIO DE CASTILHOS substation is located in the rural area of the municipality of Julio de Castilhos – State of Rio Grande do Sul, approximately 320 km from Porto Alegre – RS.