VISION ENERGIZES 150 MW / 138 KV SUBSTATION IN JAÍBA – MG

VISION energized in May 2021 a high voltage substation of the UFV JAÍBA project in Minas Gerais (Photovoltaic plant for energy generation) belonging to CANADIAN SOLAR / NEBRAS.
The turnkey scope provided by VISION included the execution of a 34.5 kV / 138 kV high voltage collector substation to flow a generation of up to 150 MW and a 138 kV sectioning substation CEMIG standard for interconnection to the transmission system , which is standard with MMHC modules (Compact Hybrid Maneuver Module – GIS technology) and an electrical room in an electrocenter to house P&C panels.
As well as the two substations, VISION also supplied, including design, materials, assembly, civil works and other services (turnkey), 3 km of 138 kV transmission line for sectioning the Janaúba 1 – Manga 3 transmission line.