VISION DELIVERS THREE MORE ELECTROCENTERS TO CEMIG-D

The contract that was signed between VISON and CEMIG-D in 2019 provides for the supply of 23 electrical rooms of the electrocenter type, manufactured in a metallic, modular and transportable structure, with 13 Integrated Modules for Medium Voltage Maneuvering and Control – MIMC-MT and 10 Unitary Control and Protection Modules – MUCP, to be delivered by 2022.
The rooms will be installed in substations in several regions of Minas Gerais and are being built and integrated in the VISON factory, in Contagem/MG.
This project reinforces VISION’s expertise in the development and construction of electrocenters, not only for industry but also for energy concessionaires throughout Brazil.