VISION GROUP SIGNS CONTRACT WITH CEMIG FOR IMPLEMENTATION OF BETTERNESS AND REINFORCEMENT ON EMBORCAÇÃO 500KV SUBSTATION

Execution of whole project includes substitution, relocation and installation of  full sections (bays/modules) of 500kV and 138kV, with supply of protection and control system, lightning rods, circuit breakers, among other equipments. Electrical room will be E-house type, built and comissioned at VISION’s industry. Emborcação hydroelectric plant, located at Araguari (MG) municipality, over Paranaíba river, was […]

CEMIG’S CONFINS SE IS SUCESSFULLY ENERGIZED

138kV substation CONFINS 1 was energized by Grupo VISION. The scope of supply turnkey comprehends, among others, a compact hybrid switchgear module (MMHC) SF6 gas-insulated 145kV/40kA 2.000A, a 138KV/13,8kV 15/20 MVA transformer, a E-house with all systems and subsystems, an 15kV air-insulated switchgear, a capacitor bank of 6 MVAr, a digital system of protection and […]

VISION GROUP SUPLLIES E-HOUSE FOR ANGLO AMERICAN IN LESS THEN 80 DAYS

E-house for Anglo American briquetting project was supplied in less than 80 days from VISION Group, counted from contract signature to initial date of transport. Scope consisted of project supply, fabrication, transport and assembly supervision, E-house equipped with acclimatization, fire detection and fire alarm, JCC LV, frequency inverter panel, PLC, far-flung, auxiliary services transformer, auxiliary […]

VISION Group signed a supply contract with CEMIG GT for turn-key substation Neves 1 – 500kV

VISION signed a contract with CEMIG GT to supply projects, engineering services, civil work, electromechanical assembly and low and high tension material and equipment sourcing in full-time endeavor (turn-key), for full deployment of reinforcements and improvements on Substation Neves 1 – 500kV. Alongside with an extense scope of sourcing, the execution of the endeavor of […]

CEEE-D – Rio Grande 2 Substation – AIS – 25 MVA

HIGHLIGHTS: Place: Rio Grande, RS – Brasil Value: R$ 15 Milhões Replacing an existing transformer; Installation of a second 25 MVA transformer; Construction of new outputs for medium voltage networks; Full unit digitalization. The Project: The VISION Group completed the expansion of the Rio Grande Substation 2, in the South Coast of RS. The work, […]

CEEE-GTO – Guarita Substation – 230/69 kV – 83 MVA

HIGHLIGHTS: Place: Erval Seco, RS – Brasil Value: R$ 15 Milhões Beginning: 10/16 End: 10/17; 230/69kV – 83MVA Transformation Module; Installation, relocation and handling equipment; Execution, adequacy and expansion of electromechanical and civil facilities; Execution and planning of activities on energized line. The Project: CEEE-GTO Guarita substation 230/69 kV – 83 MVA. Grupo VISION delivers […]